Loading Events
  • This event has passed.

Basslink: Tasmanian Supplementary Generation Project

March 8, 2017 @ 5:30 pm - 7:00 pm AEDT

Event Category:

Abstract:  

In December 2015, Tasmania experienced a failure of the Basslink undersea cable combined with low dam levels and record low rainfall. These events necessitated the rapid deployment of significant generation capacity at key locations in the state. Hydro Tasmania (Generation NSP), with support from TasNetworks (Transmission and Distribution NSP), then began to dispatch
supplementary generation throughout the state.

During his presentation Michael, who helped identify suitable connection points for generation, will discuss the project, the technical and environmental challenges that were overcome and how supplementary generators were able to provide insurance against continued drought conditions and a possible prolonged Basslink outage.

Biography of the presenter

Michael has over 25 years’ experience in the electricity industry, with initial experience in heavy industry before gaining generation, distribution and transmission exposure. Michael’s engineering knowledge is wide ranging, from heavy industry motor and process control, through engineering distribution & transmission design, system planning and currently asset management.

Michael holds trade, Associate Diploma, Degree and Masters level qualifications in electrical engineering. Michael is also involved with Engineers Australia division in Tasmania as well as being state chair of EESA. He is also a member of Cigre substation committee B3 and has membership with IEEE.

RSVP at https://pes-eesa-seminar-basslink2017.eventbrite.com.au

For more information, please contact [email protected]

Venue

Engineers Australia

Engineers Australia Office, Level 31, 600 Bourke Street Melbourne
Melbourne, Victoria 3000